Construction Update September 2022 Liberty UpdateAbove, JML Quarries delivers three loads of stone for the site work in the back of the studio building.In the next two weeks, we plan to have all of the site work done, including the trench to the satellite dish pole, drainage connecting to the roof leaders, and gradingAll the interior and exterior mechanical pads have been formed and concrete from Sullivan Structures poured.We passed our first Town of Liberty inspection.We passed our electrical inspection.We are continuing with rafter vents and insulation in the walls and ceilings. Construction Update September 2021 Exterior cladding Video walkthrough of Liberty studio construction- September 2021 Groundbreaking June 2021 Sullivan BOCES assisting with construction Spring 2021 Pouring cement